
Non-DCR Solar Panels After June 2026: What's Actually Banned, What's Still Allowed
ALMM List-II takes effect June 1, 2026. India has module capacity for 210 GW but certified cells for only 26.5 GW. Here's what EPCs must do before the squeeze hits.
All Articles

Japan FIT Solar Curtailment 2026: FIT vs FIP Guide
From October 2025, FIT projects curtailed before FIP. FIT income is zero for curtailed generation. Kyushu, Shikoku, Hokkaido highest risk.

Japan Closed Mega Solar: Rooftop FIT at JPY 19 Per kWh Is Now the Only Path
Japan's Mega Solar Countermeasure Package ended ground-mount support. Rooftop FIT at JPY 19/kWh is the only government-backed path.

Japan FIP Auction Window Closes September 30
FIP auctions for large-scale Japanese solar end Sept 30 2026. Three rounds remain. No support from FY2027. Act before the window closes.

3.2 GW of Korean Rooftop Solar Can Now Earn I RECs
3.2 GW of Korean rooftop solar can now earn I RECs. Corporate RE100 buyers are active. Most installers have not told their clients yet.

Korea Rooftop Solar Siting Rules 2026: EPC Guide
Korea's February 2026 amendments exempt rooftop solar from all siting rules. Previously blocked projects are now viable. 200 kW subsidy ceiling.

South Korea RPS Phase Out 2026 — Solar EPC Playbook
Korea's RPS ends December 2026. K REC revenue disappears. Every EPC with projects in the pipeline needs revised financial models now.

Australia Solar Panel Price Rise In 2026
China VAT removal adds 9 to 10%. Combined 15 to 20% increase. Australian installers must lock stock and shorten quote validity before June.

Australia Battery Rebate 2026: Solar Installer Guide
Federal battery program, expanded to an estimated AUD 7.2 billion over 4 years. 3.7 million solar homes without storage. CEC battery accreditation is mandatory. The retrofit market is open now.

AEMC Solar Curtailment Reform 2026: Installer Guide
AEMC draft rule addresses rooftop solar curtailment. Submissions close June 4. 28.3 GW affected. Check your installed systems now.

Best Solar Design Software in India for 2026
Six tools compared across mobile capability, BOM automation, India-specific compliance, and the use case each one actually serves best. Written for EPC business owners making a real decision.

Reslink vs Aurora Solar vs Arka360: Which Is Right for You?
An honest three-way comparison of Reslink, Aurora Solar, and Arka360 for solar EPCs — covering mobile design, BOM automation, bank-ready documents, and which suits your workflow.

How Reslink's 3D Solar Design Works: Site to Bankable Output
Reslink's 3D solar design workflow takes a field rep from roof survey to proposal, BOM, and bank-ready documents in a single site visit. Here is exactly how it works.

Mexico Solar Compensation Schemes 2026
Mexico has three solar compensation options. Net metering, net billing, and total sale each suit different client profiles. Here is how to choose the right one.

Nearshoring and Solar in Mexico — The C&I Opportunity for EPCs
Mexico's nearshoring boom is filling industrial parks in the north. Every new factory needs power. Here is how solar EPCs can capture this C&I wave.

Mexico Distributed Generation Rules 2026 — What Solar EPCs Must Know
CRE published new DG rules in April 2026. The threshold rises to 0.7 MW and storage is now formally regulated. Here is what changed for Mexican solar EPCs.

DPPAs in Vietnam — How Buyers Can Now Purchase Solar Directly
Decree 57 enables Direct Power Purchase Agreements in Vietnam. Industrial parks can now buy solar without going through EVN. Here is what EPCs need to know.

Vietnam's Self Consumption Solar Rules — What EPCs Should Know
Decree 58 is Vietnam's active solar framework. Self consumption gets priority treatment and lighter regulation. Here is what every EPC needs to know.

Vietnam May Let You Sell 50% of Your Solar Back to the Grid
Vietnam's Ministry of Industry and Trade proposes raising surplus solar sale to 50%. Still a draft — here is what EPCs should track and do now.

Load Shedding Is Over — Why Solar Is Still the Smart Choice in 2026
South Africa went 300 days without load shedding by early 2025. Rising Eskom tariffs, aging infrastructure, and threat of future outages make the financial case for solar stronger than ever in 2026.

Eskom's Tariff Hikes Just Made Solar More Profitable Than Ever
NERSA approved Eskom tariff increases for 2026 to 2028. South African solar EPCs who know how to calculate the new ROI and present it clearly will close more deals this year than any year before.

The SSEG Deadline Is September 2026. Act Now or Pay the Fine
Eskom extended the SSEG registration deadline to 30 September 2026. Unregistered solar installations face fines of R27,000 to R50,000 and potential disconnection.

The Merger Fee That Is Blocking Commercial Solar Above 500 kW
EgyptERA's Circular No. 3 of 2022 imposes a merger fee on commercial solar above 500 kW. Isolated self consumption systems are fully exempt. Here is what EPCs need to know.

How Net Metering Actually Works for Homes and Businesses in 2026
Egypt's net metering framework allows homes to offset their electricity bills with rooftop solar. The scheme has a 1,000 MW national cap, steps for connection, & rules on battery integration.

Electricity Tariffs Just Rose Again. Solar Payback Is Now Under 5 Years.
Egypt has implemented electricity tariff increases particularly for higher consumption brackets in 2025 and 2026. A 5 kW rooftop solar system now pays back in 4 to 5 years.

Multi Site Net Metering Is Here. How to Sell More Solar Per Client.
The Philippines DOE has introduced multi site and aggregate net metering, allowing consumers to share energy credits across multiple accounts. Here is how solar EPCs can use this to win projects.

Philippines Solar ROI 2026 — Meralco Bills Make Solar the Easiest Sale
Meralco rates hit ₱14.35/kWh in 2026. A typical Filipino home can achieve solar payback in 3.5 to 4.5 years. Here is how Philippine solar EPCs can use the electricity bill as the most powerful tool.

Philippines Net Metering Approvals Now Take 10 Days.
The Philippines DOE has mandated net metering approvals in just 10 working days under DC2026-01-00012. Here is what the new circular means for solar EPCs.

Solar Proposal Software vs Manual Quotation: The India EPC Math
Is solar proposal software worth it for Indian EPCs? Here is the rupee cost-of-delay math, the time comparison, and the closing rate difference for Indian market conditions.

How to Create a Solar Quotation: One that Converts Indian Customers
The solar proposals that close deals in India lead with rupee savings, shadow analysis, and generation data — not page counts. Here is what your proposal must contain, and how to build it on-site.

How to Survey and Design a Wind Solar Hybrid Site
Wind solar hybrid projects use the same land, same grid connection, and same substation for both technologies. Here is how solar EPCs should approach a hybrid project in India.

ALMM Compliance 2026: What Every Indian Solar EPC Must Know
The ALMM List II inverter deadline is June 2026. Here is what every Indian solar EPC needs to know — what changes, what is at risk, and the compliance checklist to run before the deadline.

India Is Targeting 100 GW of Wind by 2030
Union Minister announced India will achieve 100 GW of wind by 2030. From 56 GW today, that means 44 GW more in four years. Solar EPCs who partner into wind & hybrid projects can access this pipeline.

PM Surya Ghar Muft Bijli Yojana: The Complete 2026 Guide for Solar EPCs
Everything Indian solar EPCs need to know about PM Surya Ghar in 2026 — subsidy slabs, eligibility, DISCOM application process, common mistakes, and how to build a sales system around the scheme.

How to Add Battery Storage to an Existing Solar Project
Adding battery storage to an existing solar installation is different from fresh solar plus storage install. Here's how to assess retrofit, choose the right coupling method for Indian clients in 2026.

Solar O&M Is Now a Serious Business — Here Is How EPCs Can Build One.
India's solar O&M market now has 150 GW of installed capacity needing regular maintenance. Here is how smaller EPCs can build an O&M business alongside their project work.

India Just Hit 256 GW Peak Power Demand — Solar Carried a Third of It.
India hit a record 256.11 GW of peak power demand. Solar generated 81 GW — a third of total generation. Here is what this milestone means for solar EPCs and where the next opportunity lies.

PM Surya Ghar Is Blacklisting Bad Vendors — Here Is How to Win on Trust
UPNEDA blacklisted a PM Surya Ghar vendor in Prayagraj in March 2026. In J&K, one case involved complaints from 55 clients against a single vendor. Here's how EPCs can turn this into an advantage.

India Wind Renewable Consumption Obligation 2026
India now has a separate Wind Renewable Consumption Obligation alongside its solar RPO. With 6.05 GW of wind added in FY2026, here is how wind market is growing & why solar EPCs should pay attention.

PM Surya Ghar's Subsidy Got Bigger — Are You Using the New Numbers?
The PM Surya Ghar CFA rate increased 23% in January 2026. In Gujarat, state top ups push total reachable subsidy to Rs 1.18 lakh. Most EPCs are still quoting old numbers. Here is the breakdown.

How to Get Your First 50 Solar Leads When You Are Just Starting Out
New solar EPC in India? The 7 lead generation channels that work — from Google My Business and IndiaMart to WhatsApp RWA groups and referral programmes. Step by step, with realistic timelines.

How 3D Design Closes More Solar Deals — Indian EPC Guide
Solar companies using 3D Design close 30% more deals than those using PDFs. Here is why clients decide faster when they see their roof, how to use 3D design tool, what Indian EPCs say after switching.

How To Start a Solar EPC Business in India 2026
Starting a solar EPC business in India? This guide covers the four business models, mandatory registrations, minimum investment by type, how to get MNRE empanelment for PM Surya Ghar.

India's Green Hydrogen Mission 2026 — What Solar EPCs Need to Know
India has commissioned 8,000 tonnes per year of green hydrogen capacity and awarded green ammonia contracts at Rs 49-64 per kg. Here is why this matters for solar EPCs.

How to Size and Quote Battery Storage for Commercial Solar in India
Maharashtra now mandates battery storage for all new commercial solar above 100 kW. This guide explains how to size a BESS, what it costs in 2026, and how to present the ROI to your client.

PM KUSUM 2.0 Is Coming — India's Rs 50,000 Crore Agricultural Solar Push
India's farm solar scheme PM KUSUM is expected to get a successor with a Rs 50,000 crore budget, 10 GW agrivoltaics, and stronger payment mechanisms. Here is what EPCs can expect and how to prepare.

SECI Is Now India's Only RE Bidding Agency
MNRE has made SECI the only agency allowed to issue new renewable energy bids in India. NTPC, NHPC, and SJVN can no longer float fresh tenders. What does this mean for EPCs bidding on solar projects?

Maharashtra Now Requires Batteries With Commercial Solar
From April 1, 2026, Maharashtra requires battery storage on all new solar projects above 100 kW. What this means for EPCs — and how to price, design, and propose solar plus storage correctly.

India Is Set to Become the World’s Second Largest Solar Market in 2026
India added 44.6 GW of solar in FY2026 — its biggest year ever — and is on track to become world's second largest solar market. Here is why the next three years the best time to be solar EPC in India.

Design First, Visit Once: The 3D Shift in Solar EPCs
Indian EPCs using 3D design tools have reduced site visits from three to one and proposal time from hours to minutes. Here is exactly what changes in the workflow, and what to look.

How to Do a Proper Solar Site Survey — The Indian EPC Guide
A complete solar site survey checklist for Indian EPCs — 12 things to verify before quoting any project. Covers roof assessment, shading, sanctioned load, and how to do 80% remotely before first visit

Most Common Mistakes Solar EPCs Make — and How to Avoid Them
These 10 solar installation mistakes cost Indian EPCs crores in lost margin, DISCOM rejections, and client disputes. Each one is preventable with the right process.

Net Metering Approvals in India — A Step by Step State Guide for EPCs
A complete step by step guide to getting net metering approval in India in 2026. Documentation checklist, DISCOM state rules for Maharashtra, Gujarat, Delhi, and Rajasthan, and how to avoid rejection.

India's Wind Energy Just Had Its Best Year — Hybrid Is Next for EPCs
India added a record 6.05 GW of wind capacity in FY2026, driven by C&I open access and hybrid project growth. For solar EPCs, this is the signal that hybrid solar wind is the next major segment.

Two Policy Changes That Are Improving EPC Margins Right Now
India cut GST on solar equipment from 12% to 5% in September 2025 and extended battery customs duty relief in February 2026. Here is exactly how much EPCs save per project.

India’s Solar Grid Is Sending 35 GW of Power Nowhere
Crisil Ratings warns that over 35 GW of India's renewable capacity faces grid curtailment risk in FY27. Rajasthan and Gujarat are worst hit. Here is what it means for EPCs.

KPI Green’s Playbook: From First 15 MW to a 4.74 GW Solar Empire
KPI Green Energy built a 4.74 GW solar portfolio from a 15 MW start. Here's the exact sequence they used — from first CPP project to Khavda Solar Park — and what every EPC can learn from it.

State-Level BESS Tenders Are Now the Fastest-Growing Segment in Indian Solar
West Bengal just floated a 500 MW / 2,000 MWh BESS tender. Telangana, Gujarat, and Maharashtra are all in the game. State-level storage tenders are exploding — here's what EPCs need to know.

Your First C&I Open Access Project: A Step-by-Step Entry Guide
C&I open access solar is heading to 57 GW by FY28. Most EPCs who install rooftop don't know how to enter the segment. This guide walks through every step — from client identification to commissioning

India Hits 143 GW Solar Milestone — What this Really Means for EPCs
India's solar capacity has crossed 143 GW with 88% of new RE additions coming from solar. Here's what this record-breaking pace means for EPC opportunity, workload, and strategy in 2026.

92 GWh of Battery Projects, a 900 MW EPC Turning IPP, and the Pivot to Energy Security
India's battery storage pipeline hits 92 GWh. EPCs are becoming IPPs. The solar business model is shifting under your feet. Here's how to stay ahead.

25 Lakh Systems Installed. 75 Lakh to Go — India’s Biggest EPC Opportunity
25 lakh installed, 1 crore targeted. Parliamentary committee flags slow progress, FY27 deadline looming. Here's why India needs 2,300 rooftop installations per day — and what that means for EPCs.

Non-DCR Solar Panels After June 2026: What's Actually Banned, What's Still Allowed
ALMM List-II takes effect June 1, 2026. India has module capacity for 210 GW but certified cells for only 26.5 GW. Here's what EPCs must do before the squeeze hits.

Oil at $126, Hormuz Shut, LPG Vanishing — Why Solar Just Became India’s Most Important Business
The Hormuz crisis has sent oil past $126 and shut India’s LPG supply. Here’s why solar EPCs are now critical to India’s energy survival — and how to capitalize.


