ALMM List-II: Every Approved Solar Cell Manufacturer, by Capacity
ALMM List-II at a Glance
The ALMM Order has two lists. List-I names approved solar PV module manufacturers and models. List-II names approved solar PV cell manufacturers and models. MNRE issued the first List-II on July 31, 2025 and has revised it 12 times since. The latest revision is dated October 8, 2026 and added Gopin Semicon of Surat.
Which projects must use List-II cells is covered in our guide to DCR and non-DCR solar panels. This page answers a narrower question: who is on the list, with how much capacity, and in which technology.
The Full List of ALMM List-II Cell Manufacturers
The table shows each enlisted manufacturer's latest capacity in MW a year, as of the 12th revision. Where a unit has two cell technologies, both are shown and added.
Manufacturer | State | Technology and capacity (MW a year) | Total |
|---|---|---|---|
Waaree Energies | Gujarat | Mono PERC 1,328, TOPCon 4,021 | 5,349 |
TP Solar | Tamil Nadu | Mono PERC 4,480, TOPCon 53 | 4,533 |
Avaada Electro | Maharashtra | TOPCon 3,621 | 3,621 |
FS India Solar Ventures | Tamil Nadu | No technology listed (enlisted through List-I) | 3,433 |
Premier Energies Photovoltaic | Telangana | Mono PERC 1,280, TOPCon 1,358 | 2,638 |
Mundra Solar PV (Adani) | Gujarat | TOPCon 2,298 | 2,298 |
Jupiter Solartech | Himachal Pradesh | Mono PERC 991, TOPCon 1,297 | 2,288 |
EMMVEE Energy | Karnataka | TOPCon 2,153 | 2,153 |
Mundra Solar Energy (Adani) | Gujarat | Mono PERC 1,939 | 1,939 |
ReNew Photovoltaics | Gujarat | Mono PERC 1,766 | 1,766 |
Reliance Industries | Gujarat | HJT 1,238 | 1,238 |
Websol Energy System | West Bengal | Mono PERC 1,202 | 1,202 |
Premier Energies International | Telangana | Mono PERC 1,174 | 1,174 |
Fujiyama Power Systems | Uttar Pradesh | Mono PERC 1,077 | 1,077 |
Evervolt Solar Technology | Andhra Pradesh | Mono PERC 1,074 | 1,074 |
Jupiter International | Himachal Pradesh | Mono PERC, two units (339 and 440) | 779 |
Renewsys India | Telangana | TOPCon 552 | 552 |
Gopin Semicon | Gujarat | TOPCon 402 | 402 |
Tata Power Renewable Energy | Karnataka | Mono PERC 280 | 280 |
Total | 37,796 |
Premier, Adani (Mundra) and Jupiter each appear as more than one enlisted company, so the 19 entries are enlisted entities, not 19 unrelated groups. Enlistment is valid for four years from the enlistment date, which for the first list runs to July 30, 2029. FS India's enlistment, made through its List-I status, runs to April 28, 2028.
Capacity by Technology and by State
By technology, using the same table:
- Mono PERC: 17,370 MW, 46%.
- TOPCon: 15,755 MW, 42%.
- HJT: 1,238 MW, 3% (Reliance Industries, first enlisted in April 2026).
- No technology listed: 3,433 MW, 9% (FS India).
By state:
- Gujarat: 12,992 MW, 34%.
- Tamil Nadu: 7,966 MW, 21%.
- Telangana: 4,364 MW, 12%.
- Maharashtra: 3,621 MW, 10%.
- Himachal Pradesh: 3,067 MW, 8%.
- Karnataka: 2,433 MW, 6%.
- West Bengal, Uttar Pradesh, Andhra Pradesh: 1,202, 1,077 and 1,074 MW, about 3% each.
Most recent additions are TOPCon. The 9th to 12th revisions added or expanded TOPCon at Waaree, EMMVEE, Avaada, Jupiter Solartech and Gopin Semicon, which is why TOPCon is now close to PERC.

How to Read the Capacity Numbers
MNRE states the rule on every revision. Unless said otherwise, the capacity shown for a manufacturing unit in a revision is that unit's enlisted capacity from that date, not the sum of its earlier capacity and the new figure. The Premier Energies Photovoltaic line shows it: a Mono PERC capacity of 751 MW became 1,280 MW in the 11th revision, and the unit's separate TOPCon capacity of 1,358 MW stayed in place.
Three consequences follow for anyone adding numbers up:
- Do not add figures across revisions. Use the latest figure for each unit.
- Totals in news reports differ because they come from different revisions. Energetica India reported 26,790 MW after the 4th revision, 31,758 MW after the 8th, 35,467 MW after the 9th and 37,795 MW after the 12th.
- Efficiency and wattage ranges are claimed by the manufacturer, as the MNRE notes state. Enlistment confirms a listed model and facility, not that a unit is running at its full enlisted capacity.
The enlistment is also by model. A manufacturer can be listed for some cell models and not others, so check the cell model, not only the company name.
How Cell Capacity Compares With Module Capacity
List-I, the module list, stood at 228,524 MW after MNRE's September 16, 2026 update, according to Energetica India. List-II's 37,796 MW is about 17% of that.
Read the comparison carefully. Both are annual capacity figures on paper. Not every module made in India needs domestic cells, because the List-II requirement applies to specific project categories. The ratio does show why a module's brand is not enough: the cell inside has to come from a listed unit, and the listed cell base is much smaller than the listed module base.
What Changed in Each Revision
Revision and date | What the MNRE document shows |
|---|---|
First list, July 31, 2025 | Adani, Premier, ReNew, Jupiter, EMMVEE and FS India: 13,066 MW |
2nd, Nov 24, 2025 | TP Solar, Tata Power Renewable Energy and Websol enter |
3rd, Dec 15, 2025 | Waaree enters with PERC and TOPCon |
4th, Feb 5, 2026 | Evervolt enters; Premier and Mundra Solar PV add TOPCon models |
5th, Feb 13, 2026 | Fujiyama Power Systems enters |
6th, Apr 13, 2026 | Reliance Industries (HJT) and Jupiter Solartech enter |
7th, Apr 30, 2026 | Renewsys India enters; Websol capacity rises to 1,202 MW |
8th, Jul 22, 2026 | Fujiyama capacity rises; Avaada enters |
9th, Aug 21, 2026 | Waaree, EMMVEE and Avaada add TOPCon models and capacity; efficiency ranges revised |
10th, Sep 28, 2026 | Jupiter Solartech adds a 1,297 MW TOPCon unit; Renewsys rises to 552 MW |
11th, Oct 5, 2026 | Premier Energies Photovoltaic PERC rises to 1,280 MW; Renewsys ranges revised |
12th, Oct 8, 2026 | Gopin Semicon enters with 402 MW TOPCon |
Where Design Software Fits
A listed module only helps if the right model ends up in the bill of materials. Design software like Reslink flags ALMM status when the module is chosen, so a model that is not listed gets caught at design stage, not at procurement or inspection. The cell inside the module has to come from a List-II unit too, so ask the supplier for the cell maker's name and match it against the table above.
See the full workflow → Book a demo
Frequently Asked Questions
Q1. Is there a list of non-DCR solar panels?
No. MNRE publishes lists of what is approved: List-I for module makers and List-II for cell makers. A DCR module is one whose cells come from a List-II unit, and the DCR certificate for each batch is checked on the NISE DCR Verification Portal. Everything else is non-DCR by default. The rules on which projects need DCR modules are in our guide to non-DCR panels.
Q2. Where is the official ALMM List-II?
On MNRE's ALMM page, as one PDF per revision. The 12th revision, dated October 8, 2026, is the latest and carries the full history. The page is mnre.gov.in/en/approved-list-of-models-and-manufacturers-almm/.
Q3. Does a listed manufacturer have the capacity ready to supply?
Not necessarily. Enlisted capacity is the capacity MNRE has approved for the unit. It does not show output, order books or stock. Ask a supplier for the cell model, the enlisted unit and the batch's DCR certificate.
Q4. How long does an ALMM List-II enlistment last?
Four years from the enlistment date. The first-list units run to July 30, 2029, and the 12th-revision enlistment of Gopin Semicon runs from October 8, 2026 to October 7, 2030.
Q5. Is there an equivalent list for wafers?
Not yet. MNRE has said List-III for ingots and wafers applies from June 1, 2028. It is a future list, not a current one.
Final takeaway
ALMM List-II now lists 19 enlisted cell manufacturers and 37,796 MW a year. PERC and TOPCon are close to equal, Gujarat and Tamil Nadu hold more than half, and each new revision resets a unit's capacity instead of adding to it. For a supplier check, use the latest revision, match the cell model and not only the company, and confirm the batch's DCR certificate.
You May Also Like
- Non-DCR Solar Panels June 2026: Banned or Allowed?
- India Solar EPC Compliance Calendar 2026-27
- MNRE Country-Coded Model Numbers for Solar Modules: Confirmed vs Open
Sources
- Ministry of New and Renewable Energy, 12th Revision of ALMM List-II for Solar PV Cells, dated October 8, 2026, with all earlier revisions (MNRE ALMM page)
- Ministry of New and Renewable Energy, ALMM page listing all List-I and List-II documents and notices (last updated October 9, 2026)
- Energetica India, "Gopin Semicon Enters ALMM List-II, Total Solar Cell Capacity Under ALMM Reaches 37.8 GW" (October 2026), for the 37,795 MW total
- Energetica India, "ALMM Update: Solar Module Capacity Surpasses 228 GW in September 2026" (September 18, 2026), for List-I capacity and earlier List-II totals
- PIB, Ministry of New and Renewable Energy, ALMM for ingots and wafers (March 2026), for the List-III date
This guide reads MNRE's published ALMM List-II as of October 19, 2026. The list is revised often, and capacity, models and validity change with each revision. Check the MNRE ALMM page before any procurement decision.
Related Articles

PM Surya Ghar Complaint Against Vendor: How to File and What Happens
Filing a PM Surya Ghar complaint against a vendor: the portal route, helpline, MNRE's 8 and 15 day SOP clock, and where to escalate.

Maryland Net Metering Cutoff 2027: Confirmed vs Open for EPCs
Maryland closes net metering to new systems at the earlier of 3,000 MW or July 1, 2027. What is set, what the PSC is still deciding.

Delhi Free Rooftop Solar for EPCs: ULA Route vs Open Route
Delhi pays up to ₹78,000 on top of PM Surya Ghar, with a free ULA route under 400 units. What EPCs can sell on each route.