Is Solar Required on New Commercial Buildings From March 2027?
The Short Answer
No, not as a stand-alone rule. The Building Regulations create a new Requirement L3 for on-site renewable electricity, but it is limited to new dwellings and buildings containing dwellings. Approved Document L Volume 2, the guidance for buildings other than dwellings, says so directly and sends mixed-use developers to Volume 1 for the residential part.
Commercial buildings meet the Future Buildings Standard a different way. A new building must be shown, by calculation, not to exceed a target emission rate and a target primary energy rate. Those targets come from a notional building of the same size and shape as the real one, built to a standard specification. Government's consultation response says that specification includes panels equal to 40% of the building's foundation area for both top-lit and side-lit buildings.
So solar is built into the benchmark. Whether a design needs it depends on how the rest of the building performs.
Dates and Transition
Date | What happens |
|---|---|
March 24, 2027 | The Regulations and the 2026 Approved Documents apply to new buildings and other work that is not higher-risk building work |
September 24, 2027 | The same changes apply to higher-risk building work and work on existing higher-risk buildings |
March 24, 2028 | Last date by which work must commence to keep transitional protection |
The old rules still apply to a building where a building notice, initial notice or full plans application was given before March 24, 2027, provided the work starts before March 24, 2028. For higher-risk buildings, the changes do not apply where a valid application reached the Building Safety Regulator before September 24, 2027. Our Future Homes Standard guide covers the residential side.
How the Rule Works for a New Commercial Building
A designer uses the National Calculation Methodology, usually through the Simplified Building Energy Model, to calculate the target rates for the notional building and the building's own rates. The building's rates must be equal to or better than the targets, both at the design stage and as built. Meeting both targets is also how the guidance treats the very high performance element of the nearly zero energy requirement.
Question | Dwellings | Buildings other than dwellings |
|---|---|---|
Is there a stand-alone solar requirement? | Yes, Requirement L3 | No |
How does solar count towards compliance? | Installed to meet L3 | Assumed in the notional building that sets the targets |
Which guidance applies? | Approved Document L Volume 1 | Approved Document L Volume 2 |
Who checks? | Building control | Building control, with design and as-built calculation notices |
The specification of the actual building can differ from the notional building if it still meets the targets. A project with less roof area or a grid limit can therefore make up the difference elsewhere, in fabric, heating or lighting. Government's consultation response also records that distribution network limits could affect the feasibility of large arrays.
What Installers Must Still Get Right
Requirement L2 applies wherever a system for on-site electricity generation is installed, in a new or existing building.
- Sizing and controls. Reasonable provision must be made for the system and its output to be appropriately sized for the site and available infrastructure, and for it to have effective controls.
- Commissioning. The system must be commissioned by testing and adjusting so that it produces the maximum electricity that is reasonable in the circumstances. Section 7 of the guidance covers the notice of completion of commissioning.
- Handover information. Operation and maintenance requirements must be given to the owner not later than five days after the work is completed.
- Submetering. In new non-domestic buildings the outputs of renewable systems should be monitored separately, and buildings above 1,000 m² need automatic meter reading and data collection.
- Replacements. A replacement photovoltaic array should have a kWp capacity at least equal to the original.
- Shell and core. If on-site generation is not installed in the base build, the specification should say what is provided later, the efficiency assumed and how access will be provided during fit-out.
Who Is Exempt
Approved Document L Volume 2 exempts places of worship, temporary buildings with a planned time of use of two years or less, low energy demand industrial sites, workshops and non-residential agricultural buildings, stand-alone buildings with a floor area under 50 m², and some carports, covered yards and covered ways. Listed buildings, conservation areas and scheduled monuments have separate rules where full compliance would unacceptably change their character.
What Is Still Open
Item | Status |
|---|---|
Full notional building specification | Detailed in the National Calculation Methodology Modelling Guide, so check the current version |
Exemption of higher-risk buildings from the solar element | Commentators report that higher-risk buildings are exempt from the solar element, so check with your building control body |
How building control will treat designs with little or no solar | Not yet clear, so agree the approach with building control early |
Grid export limits for large roofs | Flagged by government as a feasibility constraint, no rule stated |
What This Means for Commercial EPCs
- Do not tell a client solar is mandatory. For new commercial buildings it is built into the target, not a legal duty to install.
- Ask for the SBEM design-stage report early. The client's designer holds the target and building emission rates, so you can see how much the proposed roof array contributes.
- Check the roof and the grid together. Roof area, loading, access and the network operator's export limit decide what size the design can actually carry.
- Plan metering and commissioning from day one. Separate monitoring of the array and a commissioning record are part of what building control will expect.
- Watch the transition date. Projects with plans submitted before March 24, 2027 and starting before March 24, 2028 are not affected, so the clients most likely to ask are those starting later.

Where Design Software Fits
On a commercial roof, the first design questions are layout, array size and bill of materials. Design software like Reslink produces the layout, bill of materials and single line diagram, so an array can be sized against the roof and the client's targets. It does not run the Part L calculation or decide compliance.
See the full workflow → Book a demo
Frequently Asked Questions
Q1. Is solar mandatory on new commercial buildings in England from 2027?
Not as a stand-alone requirement. Requirement L3 covers only dwellings. For commercial buildings, solar is assumed in the notional building that sets the energy targets.
Q2. What does the notional building include?
Government says it includes panels equal to 40% of the building's foundation area for top-lit and side-lit buildings. The full specification is in the National Calculation Methodology guide.
Q3. When do the new rules start?
March 24, 2027 for most buildings and September 24, 2027 for higher-risk buildings, with transitional protection for projects already in the system.
Q4. Can a new commercial building meet the targets without panels?
The guidance says the actual building can vary from the notional specification if it still meets the target emission and primary energy rates.
Q5. Which buildings are exempt?
Places of worship, temporary buildings of two years or less, low energy demand industrial, workshop and agricultural buildings, and stand-alone buildings under 50 m², among others.
Q6. What applies if I install solar on a new commercial building?
Requirement L2: the system must be sized for the site and grid, have controls and be commissioned, with handover information within five days of completion.
Q7. Does this affect existing commercial buildings?
Not through a solar requirement. Existing buildings follow the other parts of the guidance, such as replacing a PV array with one of at least the original capacity.
Final takeaway
For commercial EPCs the headline is that solar is not mandatory but is built into the energy targets that new buildings must meet from March 24, 2027. The practical work is to size and commission arrays properly, plan metering and talk to designers early about the SBEM results.
You May Also Like
- Future Homes Standard 2027: Solar Requirement L3 for UK Installers
- UK Solar and Battery Compliance Calendar 2026-27: Dates and Deadlines
- BS 7671 Amendment 4: What Solar and Battery EPCs Must Do
Sources
- MHCLG, Approved Document L, Volume 2: Buildings other than dwellings, 2026 edition
- MHCLG, The Future Homes and Buildings Standards: Building Circular 01/2026 (March 24, 2026)
- MHCLG, Future Homes and Buildings Standards: consultation response (March 2026)
- legislation.gov.uk, The Building Regulations etc. (Amendment) (England) Regulations 2026 (S.I. 2026/335)
This guide reflects the 2026 Approved Documents and the regulations as of November 17, 2026. It is for information and is not building control advice, so check the current edition of Approved Document L and your building control body for a specific project.
Related Articles

State-Wise Solar Subsidy 2026: Confirmed PM Surya Ghar Top-Ups
The central PM Surya Ghar subsidy is the same everywhere. Which states add a top-up, how much, who qualifies and what EPCs can safely quote.

Wholesale CfD for Existing UK Solar Farms: What DESNZ Proposes
DESNZ wants existing solar farms on fixed-price contracts. Who qualifies, the 5 or 10 MW threshold, the metering upgrade and the Dec 9 deadline.

Gujarat Solar Subsidy 2026: The 2.18 kWp Top-Up for EPCs
Gujarat's top-up cuts the household share of PM Surya Ghar rooftop solar to 10% up to 2.18 kWp. Rules, examples, the sizing cliff and open points.